, , ,

Cleanroom Turnkey Project

Cleanroom turnkey project means blocking out and excluding all the pollutants such as microparticles, harmful air, bacteria, etc, within a certain space, reasonably distribute the overall plant structure in the area to meet the requirements of the production process; and controls the temperature, humidity, cleanliness, space height, room pressure, airflow velocity, airflow distribution, noise, vibration, electric distribution, lighting, static electricity, etc, in the effective space(cleanroom) within a certain area of requirements. It’ s a specially designed room.

Marya Cleanroom Turnkey Project|medical cleanroom turnkey construction project Chinese manufacturers

1. Why Choose Us:

1. In Our medical cleanroom turnkey construction project, the clean room  cleanliness level is high, the whole clean room system meets the requirements of GMP, FDA, WHO, and other pharmaceutical standard; and our products far exceed other clean room companies;
2. Able to realize BMS automatic control;
3. Modular clean room design, fast installation;
4. Construction materials are CE certified;
5. High degree of safety, equipped with safety doors and fire dampers;
6. clean room can From A-Z, one-stop service from design to construction verification;
7. Can accurately control the temperature, humidity, pressure difference, the number of dust particles and planktonic bacteria;
8. The brand of HVAC can be specified by the customer;
9. Able to send workers abroad for installation;
10. We have a strong design team, able to design according to customers’ different needs.

2. Marya Cleanroom turnkey project Service Scope:

Cleanroom Project Scope(from structure, HVAC,electric to auto-control) 1. Cleanroom Structure: Wall Panel, Ceiling Panel, Windows, Doors, Fittings, Flooring
2. HVAC: AHU, Chiller, dehumidifier, Ducting, Piping, etc.
3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc
4. Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Panel
5. Process Piping System: Gas, Water Pipeline
Equipment Air shower, Cargo shower, Mist shower, Dynamic pass box, Static pass box, Sampling booth, Weighing booth, Dispensing booth, Medicine stability test chamber, isolator, VHP sterilizer, Biological safety chamber, FFU, LAF, etc.
Temperature 21-27℃ (or as per required)
Humidity 30-60℃ (or as per required)
Application Pharmaceutical factory, hospital, medical device factory, electronics factory, food factory, cosmetics factory, etc.
Qualification Documents DQ, IQ, OQ, PQ
Full Service FAT and SAT Service, Professional Consultation, Training, User-friendly English Software, 24 hours technical support

 

en_USEnglish
Scroll to Top