Hogar " Marya Cleanroom Cargoes Sent to Uganda

Marya Cleanroom Cargoes Sent to Uganda

Marya-Uganda cleanroom turnkey project was comfirmed in July and cargoes are now officially shipped in September. The cleanroom materials and equipment ordered by the client will be shipped on time and will soon be transported to the production line of the project for use.

Uganda Cleanroom Turnkey Project
Uganda Cleanroom Turnkey Project

We propose customized cleanroom turnkey engineering solutions tailored to the specific needs of our clients. The products include cleanroom doors, windows, panels, air conditioning units, filters, pass boxes, control systems, etc., which fully comply with GMP requirements. The air conditioning units have reached cleanliness class D, with 20 air changes per hour, a temperature of 22+/-2 degrees, and a humidity of 45% -60%.

1. Cleanroom products have high quality standards.

We conducted FAT (Factory Acceptance Test) on air conditioning units and control systems, and took photos and videos. And we also obtained BV certification under the witness of third-party organizations. Although the client did not participate in this test, we organized the corresponding test data and results into a file and directly sent them to the client, which received high recognition from the client.

Uganda Cleanroom Turnkey Project
Uganda Cleanroom Turnkey Project
2. Cleanroom products are shipped with sturdy packaging.

The vast majority of cargoes are packed in wooden boxes. The packaging form of other cargoes is bundled. We use multi-layer board, foam pad, foam wrapping paper, plastic film and other padding materials to prevent accidental damage to the product during transportation.

Uganda Cleanroom Turnkey Project
Uganda Cleanroom Turnkey Project

Through close collaboration among various departments, cleanroom materials and equipment have been tested and inspected multiple times before being shipped on schedule.

Through close collaboration among various departments, cleanroom materials and equipment have been tested and inspected multiple times before being shipped on schedule.

es_ESSpanish
Scroll al inicio